06 / COMMISSIONING / FUNCTIONAL TESTING
From completed installation
to verified operation.
We coordinate the technical steps between installation and operation, verify settings, signals and agreed scenarios, and record the status at handover.
Discuss this serviceSERVICE SCOPE
Start-up is an event. Handover is a process.
The goal is a traceable record of what was configured, what was tested and what remains open.
Readiness and programme
Inputs, access and supplier cooperation checked before work begins.
Parameterisation
Plant settings aligned with approved design documents.
Functional verification
Signals, communications, interlocks and operating scenarios tested to scope.
Handover
Results, configuration backups and open points recorded and transferred.
WHAT TO PREPARE
Inputs for a useful start.
- As-built design
- Approved settings and functional description
- Manuals and authorised equipment access
- Programme and responsible contacts
WHAT WE DELIVER
An output you can use.
Functional test records, an overview of settings and handover evidence.
The test scope, responsibilities and required safety measures are agreed before commissioning starts.
PRACTICAL DETAILS
Questions we are
often asked.
Do the technology suppliers need to be present?
It depends on access rights and scope. Required cooperation is defined in the commissioning plan.
Will we receive configuration backups?
The agreed formats and configurations are included subject to access rights, licences and equipment capability.
Can commissioning be coordinated with RfG testing?
Yes. Integration, commissioning and RfG testing can share one programme while keeping scopes and outputs distinct.
START WITH THE BRIEF
What should your
project achieve?
Tell us the asset type, project stage and the outcome you need. We will start from there.
Discuss a project