01 / COMPLIANCE VERIFICATION

Grid requirements.
Verified by measurement.

We prepare and carry out tests of power-generating modules to an agreed scope, the system operator requirements and the applicable methodology. The result is traceable data and an assessment that can be reviewed.

Discuss this service
RfGGRID CODEUPOS / UTP
GC / 01 / COMPLIANCE VERIFICATION
01 / BRIEF02 / DELIVERY03 / OUTPUT
Service principle—not measured data or a manufacturing drawing.

SERVICE SCOPE

A successful test starts before anyone arrives on site.

We first align the scope, documents and technical readiness. Only then do we agree the measurement programme and test date.

01

Scope and readiness

Review of the connection documents, module identification and the required test set.

02

Measurement plan

Test sequence, boundary conditions, required cooperation and scheduling.

03

Functional tests

Verification of the relevant control functions and the actual plant response.

04

Report and findings

Assessment against agreed criteria, with a clear list of open points.

WHAT TO PREPARE

Inputs for a useful start.

  • Connection agreement and conditions
  • Single-line diagram and current project documents
  • Equipment types, firmware versions and settings
  • Protection and control documentation

WHAT WE DELIVER

An output you can use.

A test report, recorded conditions, measured data, assessment and a structured list of findings.

The evidence required for compliance is project-specific. A GridCoda test report is not automatically an accredited certificate and does not replace the system operator’s decision.

PRACTICAL DETAILS

Questions we are
often asked.

Is the test scope always the same?

No. It depends on the module category, connection conditions, applicable rules and the evidence already available.

Does completing the tests automatically grant permanent operation?

No. Test results form part of the evidence. Permission for permanent operation is a separate process with the relevant system operator.

What happens if a non-compliance is found?

We record the conditions and finding, identify the affected interface or function and agree the corrective and repeat-test steps.