RFG TESTING / CONTROL / OPTIMISATION
Energy
under control.
From grid connection
to daily operation.
RfG testing, UPOS and UTP support, protections, control systems and energy optimisation for solar, battery storage and industrial sites.
Discuss a projectExplore services01 OUR EXPERTISE
From the first diagram
to verified operation.
Testing, control and delivery—standalone or as one connected scope.
RfG compliance testing
Test planning, on-site measurement and reports that document the compliance of a power-generating module.
02UPOS and UTP support
Technical readiness, evidence and test coordination for UPOS and the subsequent UTP process.
03LV and MV protection settings
Design, configuration and verification of LV and MV protections, including ABB Relion and ComAp MainsPro.
04Control and integration
Dispatch control, power regulation and integration of energy assets with supervisory systems.
05AXY control panels
Design, supply and commissioning of panels for metering, communication and remote control.
06Commissioning
Parameterisation, interface checks and functional tests before operational handover.
07Spot-price control
Control of solar, BESS and flexible demand using price signals, operating constraints and live plant state.
08Energy optimisation
Self-consumption, peak shaving and coordinated assets within one operating strategy.
We agree the scope, interfaces and responsibilities before work begins.
View all services02 ENERGY OPTIMISATION
Price is a signal.
The system makes the decision.
We connect energy economics with what the installed technology can safely deliver.
Charge now. Use later.
Lower contracted price
Compare cost and later value
Charge BESS / shift demand
CONTROL BOUNDARYSoC, efficiency, import limit
A low market price is not the final cost of energy. Contracts, losses, battery wear and operating reserves belong in the decision.
Energy optimisationGenerated. Where should it go?
Generation exceeds demand
Compare use, storage and export
Demand / BESS / export control
CONTROL BOUNDARYExport price, SoC, export limit
When export is unattractive, the strategy can preserve valuable self-consumption and regulate only the surplus.
Energy optimisationSupport the site. Protect the limit.
Demand approaches the limit
Evaluate reserve and priorities
Discharge BESS / defer load
CONTROL BOUNDARYAvailable power and capacity
The battery must be prepared in advance. The same capacity cannot be reserved for trading, backup and peak shaving without explicit priorities.
Energy optimisation03 TECHNOLOGIES
One system.
Different assets.
Generation that respects the point of connection.
Links between inverters, metering and plant control, including test preparation, regulation and dispatcher communication.
Battery, PCS and control working to one rhythm.
Integration of BMS, PCS and EMS with defined command priorities, operating limits and verification.
Generation in the context of the entire system.
Functional links between the generator, metering and supervisory control, with agreed operating scenarios.
Multiple technologies. Clear priorities.
Coordinated generation, storage and demand, respecting equipment limits, connection requirements and market signals.
04 HOW WE WORK
First the brief.
Then the solution.
Every step has a defined output—from scope and interfaces to settings, measured data and handover documents.
ENGINEERING / TESTING / CONTROLUnderstand the brief
We review the documents, requirements and current project status.
Design the approach
We define the scope, outputs, interfaces and required cooperation.
Implement and verify
We complete the agreed engineering and tests and record the findings.
Hand over the result
You receive the agreed evidence, results and a clear list of next steps.
TECHNICAL GUIDES
Questions to resolve
before the first brief.
Spot prices and battery control: what an EMS should actually calculate
How to connect spot electricity prices with BESS operation while accounting for the contracted price, losses, degradation, SoC and grid limits.
3 min read SOLAR / NEGATIVE PRICESNegative prices and solar: curtail, store or consume?
How to decide between solar export limitation, battery charging and flexible demand when electricity prices turn negative.
3 min read RFG / CONNECTION / TESTINGHow to prepare a power-generating module for RfG testing
A practical overview of connection conditions, documents, firmware, regulation and supplier cooperation needed before RfG testing.
3 min readSTART WITH THE BRIEF
What should your
project achieve?
Tell us the asset type, project stage and the outcome you need. We will start from there.
Discuss a project