Energy optimisation
for solar, BESS and demand.

We design how the energy-management system should decide as a whole, coordinating solar, batteries, flexible demand and the grid connection. We start with data and an operating objective—not an unsupported savings promise.

Discuss this service
EMS / BESSSELF-CONSUMPTIONPEAK SHAVING
GC / 08 / ENERGY OPTIMISATION / EMS
01 / BRIEF02 / DELIVERY03 / OUTPUT
Service principle—not measured data or a manufacturing drawing.

SERVICE SCOPE

Optimise the whole system, not one price interval.

Beyond spot-price response, energy optimisation covers the site balance, demand peaks, operating reserves and priority conflicts between assets.

01

Baseline and energy balance

Interval data, pricing, metering and constraints separated into controllable and fixed costs.

02

Operating strategy

Self-consumption, peak shaving, battery scheduling and reserves based on real capacity.

03

EMS integration

Planning connected to local controls, metering, command priorities and safe fallbacks.

04

Benefit verification

Scenarios compared on the same data, followed by measurement of real response and deviations.

WHAT TO PREPARE

Inputs for a useful start.

  • Timestamped interval generation and demand data
  • Tariffs, contractual formulas and import / export terms
  • BESS and PCS parameters, SoC limits and cycling constraints
  • Connection limits, operating modes and supervisory priorities

WHAT WE DELIVER

An output you can use.

A strategy design, scenario comparison, EMS functional specification and verification plan.

Backup, peak shaving and market operation can compete for the same battery capacity. Reserves and priorities must therefore be agreed together. Modelled benefit is not a guarantee of future performance.

PRACTICAL DETAILS

Questions we are
often asked.

Is energy optimisation the same as spot-price control?

No. Price response is one tool. Optimisation also covers self-consumption, peak shaving, reserves and asset coordination.

Do we need a new battery or EMS?

Not necessarily. We first assess existing metering, interfaces and equipment capability.

Will we receive a savings calculation?

Within the agreed scope, we compare a baseline and clearly stated scenarios. Inputs and assumptions remain visible and reviewable.